When you create a task plan in Nimble, you need to select the scheduling type for it. The scheduling options appear as per the license you are using. Depending upon your license, you might be/not be able to see all the scheduling options in the Scheduling Type drop-down list of the Task Plan.

Nimble supports 4 types of scheduling to help you manage your tasks –

  • Default scheduling
  • Simple scheduling
  • Advanced scheduling
  • Microsoft Project Scheduling

Default scheduling

Default Scheduling is best suitable for small and medium size projects where limited scheduling capabilities are required.  Use Simple scheduling for Task Plans when:

1) Planned Start & Finish Dates are optional
2) Option to roll up Start & Finish dates to a summary task
3) Set Finish-to-Start (FS) dependencies between tasks with dates

Read more about the default schedule here.

Simple scheduling

Simple Scheduling is best suited for small to medium-scale projects with small teams, consisting of around 2000 tasks. Using Simple Scheduling, Project Managers can control their project schedule and make the necessary updates using simple scheduling capabilities. The Simple Scheduling capabilities will be available to you as per your Enterprise plan. Use simple scheduling when:

1) Planned Start & Finish dates are mandatory
2) All effort & date fields roll-up to a summary task
3) Set FS type of dependencies between any tasks
4) Task dates do not change based on actual dates
5) Track progress manually or based on timesheet
6) Baseline to track deviation of effort & schedule

Read about the simple scheduling in detail here.

Advanced scheduling

Advanced scheduling is the advanced version of the scheduling to help you drive your projects more efficiently with MSP-compatible capabilities. Use Advanced Scheduling for Task Plan when:

1) Same capabilities as Simple Scheduling
2) Set SF, SS, and FF type of task dependencies
3) Set constraints such as ‘Start No Earlier Than’
4) Track progress manually or based on the timesheet
5) Track the Critical Path of tasks for overall progress

Read about advanced scheduling in detail here.

Comparison of Default, Simple, Advance Scheduling, and MS Project Plug-in

A quick comparison of features between Advanced Scheduling and MS Project Plug-in will help you to choose the right Task Module for your project.

Default Scheduling

Simple Scheduling

Advance Scheduling

MSP Integration

Recommended Task List Size

Small Small and Medium Task Plans Medium Task Plans Large Task Plans

Planned Start and Finish Dates

Optional Required Required Required

Milestone

Not Available Available Available Available
Roll-updates to Summary Level Tasks

Optional

Always Always Always
Task Actuals Tracking Mode Manual Manual, Based on timesheet data Manual, Based on timesheet data Based on timesheet data

Gantt View

Available 

Available Available Available
Baseline Not Available Available Available Available

Baseline Start, Finish, Effort

Not Available Available Available Available

Calendar Integration

Not Available Project Project, and Resource

 

Project User

Default Task List from Activity Matrix

Not Available Available Available Available

Task Dependency

Finish-to-start Finish-to-start Finish-to-Start (FS), Start-to-Finish (SF),
Start-to-Start (SS), Finish-to-Start (FS)
Finish-to-Start (FS), Start-to-Finish (SF),
Start-to-Start (SS), Finish-to-Start (FS)

Task Rescheduling

Optional Available (Only for manual date change) Available (Checkout Required) Available (Checkout Required)

Task Types

Not Available Fixed Dates Fixed Dates, Fixed Unit, Fixed Work, Fixed Duration Fixed Unit, Fixed Work, Fixed Duration
Task Mode Auto-Scheduled Auto-Scheduled Auto-Scheduled and Manually Scheduled Auto-Scheduled and Manually Scheduled

Task Constraints

Not Available As Soon As Possible As Soon As Possible, Start No Earlier Than, Start No Later Than, Finish No Earlier Than, Finish No Later Than, Must Start On, Must Finish On As Soon As Possible, Start No Earlier Than, Start No Later Than, Finish No Earlier Than, Finish No Later Than, Must Start On, Must Finish On, As Late As Possible

Critical Path

Not Available Not Available Available Available

Resource Assignment (%) on Tasks

100% always Editable Editable Editable